Quiz Summary
0 of 25 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 25 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- Answered
- Review
-
Question 1 of 25
1. Question
How should the Blast Pot be positioned?
CorrectIncorrect -
Question 2 of 25
2. Question
What is the first step when setting up the blast machine?
CorrectIncorrect -
Question 3 of 25
3. Question
When blowing the airline to remove debris use full pressure.
CorrectIncorrect -
Question 4 of 25
4. Question
All hose connections must have ______ in place.
CorrectIncorrect -
Question 5 of 25
5. Question
Double wire or pin at all couplers.
CorrectIncorrect -
Question 6 of 25
6. Question
When hooking up hoses to blasting system, ensure hoses are ran as
CorrectIncorrect -
Question 7 of 25
7. Question
When using multiple outlets, each hose and control line will need to be ___________ to the proper outlet and control connection.
CorrectIncorrect -
Question 8 of 25
8. Question
Attach control (___________) to coupler
CorrectIncorrect -
Question 9 of 25
9. Question
Attach the control line to blast hose with duct tape every foot for the first ___ feet.
CorrectIncorrect -
Question 10 of 25
10. Question
Hook _________ to breather pot.
CorrectIncorrect -
Question 11 of 25
11. Question
When loading the blast pot, verify the air bleed off valve is in the _____ position and there is no _______ in the blast pot.
CorrectIncorrect -
Question 12 of 25
12. Question
How should you lift the super sacks of blast media?
CorrectIncorrect -
Question 13 of 25
13. Question
Always hammer on pressurized equipment
CorrectIncorrect -
Question 14 of 25
14. Question
Purge the blast machine of abrasive by first _______.
CorrectIncorrect -
Question 15 of 25
15. Question
Pressurize the machine by _________.
CorrectIncorrect -
Question 16 of 25
16. Question
When starting up the blast machine, always let warm up
CorrectIncorrect -
Question 17 of 25
17. Question
When starting up the blast machine, which of the following must you verify?
CorrectIncorrect -
Question 18 of 25
18. Question
______ turn ON air supply to blast machine and allow blast pot to fully pressurize.
CorrectIncorrect -
Question 19 of 25
19. Question
If a plug in the system occurs, you may need to “choke” the blast system by ________________.
CorrectIncorrect -
Question 20 of 25
20. Question
The pot tender should never leave the blast pot unattended during blasting operation.
CorrectIncorrect -
Question 21 of 25
21. Question
During the blasting process, how can you assist the blaster? (circle all that apply)
CorrectIncorrect -
Question 22 of 25
22. Question
The first step in shutting down the equipment for the day is:
CorrectIncorrect -
Question 23 of 25
23. Question
When shutting down the machine, after turning OFF the manual control valve and turning OFF air supply to blast machine, what is the most important next step?
CorrectIncorrect -
Question 24 of 25
24. Question
Let compressor idle down for at least ___ minutes and shut down.
CorrectIncorrect -
Question 25 of 25
25. Question
If returning to shop, make sure that _________.
CorrectIncorrect